DGX B200 vs. DGX B300: how they differ and how to choose
The DGX B200 and DGX B300 are both 10U systems with 8 Blackwell GPUs, but the B300 is designed for AI workloads that need more GPU memory and faster networking. For some organizations this difference will justify the move. For others, the B200 can still be the right solution.
| Topic | DGX B200 | DGX B300 |
|---|---|---|
| GPUs | 8 Blackwell GPUs | 8 Blackwell Ultra SXM GPUs |
| GPU memory | 1,440GB | Per the product page: 2.1TB |
| Dense FP4 performance | 72 PFLOPS | 108 PFLOPS |
| Main networking | Up to 400Gb/s with ConnectX-7 | Up to 800Gb/s with ConnectX-8 |
| System processors | 2 Intel Xeon Platinum 8570 | 2 Intel Xeon 6776P |
| Internal storage | 8 U.2 drives of 3.84TB | 8 E1.S drives of 3.84TB |
| Power | Up to about 14.3kW | About 14 to 14.5kW |
The figures are based on NVIDIA's DGX B200 and DGX B300 pages.
Where the B300 really makes a difference
The clear advantage is GPU memory. A system with more memory can hold larger models and leave more room for context and cache. For the B300, NVIDIA states a 1.5x improvement in dense FP4 performance and a 2x improvement in attention performance compared with the B200.
If your models already fit comfortably in the B200, you may not feel the full benefit of the additional memory.
Why networking matters for the choice
In the B300 each main connection reaches 800Gb/s, compared with 400Gb/s in the B200. A single system will not always use this gap, but a cluster of several systems may benefit from it.
That is why networking should be planned together with compute. A fast network requires suitable switches, cables and transceivers, and the B300 system also ships without network cables and transceivers.
What does not change in the infrastructure calculation
The power of the two systems is similar, and both take up 10U. So moving from the B200 to the B300 does not necessarily change power and cooling planning entirely, but it still requires a check based on the version you order. The B300 is available in both an AC version and a busbar version.
When the B200 is still right
The B200 can be a good fit when the models and workloads are already known and its memory is enough for them. It can also be right when an organization is expanding an existing B200 environment and wants to keep it uniform.
The choice also depends on the availability and price you actually get. Market sources are not consistent about availability, so the decision should be based on an up-to-date quote for the exact configuration.
Questions to answer before ordering
- What size models will you run in the next two years.
- Is it a single system or a cluster.
- Do you need 800Gb/s networking.
- What is the existing infrastructure on site.
- What is the project timeline.
Innovate IT is responsible for the first DGX B300 project in Israel and also supplies DGX B200 systems. We work with NVIDIA's representatives in Israel on supply and specifications, and help customers choose between the options based on their workload and infrastructure.